A work cell is required to make 80 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations,with times of 1.0,0.8,2.4,2.5,and 1.4 minutes each.What is takt time for this cell? How many workers will be needed?

Correct Answer

verifed

verified

Takt time = 420 minutes / 80 u...

View Answer

"Having a focused work centre is like having a factory within a factory." Discuss.Include in your discussion what conditions make focused work centers appropriate.

Correct Answer

verifed

verified

A focused work centre is a permanent pro...

View Answer

Which of the following is not a heuristic rule for assigning tasks to workstations in a product layout?


A) longest tasks first
B) in order of most number of following tasks
C) median tasks first
D) shortest tasks first
E) in accordance with positional weight

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

Identify McDonald's "seven major innovations."

Correct Answer

verifed

verified

The seven major innovations ar...

View Answer

Which of the following is a common heuristic for assembly line balancing?


A) debits near the windows,credits near the door
B) manufacturers locate near materials,retailers locate near customers
C) earliest due date first
D) ranked positional weight
E) average takt time

F) None of the above
G) A) and E)

Correct Answer

verifed

verified

Which of the following requires an information system that provides inbound product identification,its destination,and routing of the product to the designated outbound vehicle?


A) phantom-docking
B) random stocking
C) ASRS
D) customizing
E) cross-docking

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

Balancing a work cell is done


A) before the work cell equipment is sequenced.
B) as part of the process of building an efficient work cell.
C) before takt time is calculated.
D) so that each assembly line workstation has exactly the same amount of work.
E) to minimize the total movement in a process layout.

F) C) and E)
G) C) and D)

Correct Answer

verifed

verified

A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below. A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below.    a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d? a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d?

Correct Answer

verifed

verified

blured image blured image (b)The cycle time is 160/20 = 8 hours;...

View Answer

"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?


A) fixed-position layout
B) intermittent production
C) job shop
D) work cell
E) warehouse layout

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is    The matrix of work flow (estimated trips per day)is among centers    The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost? The matrix of work flow (estimated trips per day)is among centers An insurance claims processing center has six work centers,any of which can be placed into any of six physical departmental locations.Call the centers 1,2,3,4,5,and 6,and the departments A,B,C,D,E,and F.The current set of assignments is A-3,B-1,C-6,D-2,E-4,and F-5. The (symmetric)matrix of departmental distances,in meters is    The matrix of work flow (estimated trips per day)is among centers    The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost? The firm estimates that each trip costs approximately $4. a.What is the cost of the current assignment? b.Use trial-and-error to find one improved assignment. c.What is that assignment,and what is its cost?

Correct Answer

verifed

verified

(a)The current assignment costs 14,000 m...

View Answer

A fabrication line and an assembly line are both types of repetitive and product-focused layout,but only the fabrication line utilizes workstations.

A) True
B) False

Correct Answer

verifed

verified

A process-oriented layout is the traditional way to support a product differentiation strategy.

A) True
B) False

Correct Answer

verifed

verified

Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?


A) 2
B) 3
C) 4
D) 5
E) 6

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

What are the advantages of focused factories?

Correct Answer

verifed

verified

Focused factories are better a...

View Answer

One guideline for determining the arrangement and space allocation of a retail store is to place high-impulse and high-margin items such as housewares and beauty aids in prominent locations.

A) True
B) False

Correct Answer

verifed

verified

One drawback of a product-oriented layout is that work stoppage at any one point ties up the whole operation.

A) True
B) False

Correct Answer

verifed

verified

The main issue in designing process layouts concerns the relative positioning of


A) safety devices.
B) departments.
C) raw materials.
D) entrances,loading docks,etc.
E) supervisors to their employees.

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

In the Office Relationship Chart,which rating reflects the highest importance for two departments' closeness to each other?


A) A
B) E
C) I
D) O
E) X

F) D) and E)
G) A) and C)

Correct Answer

verifed

verified

Which of the following is true regarding fabrication lines?


A) They are the same thing as assembly lines.
B) They are the same thing as focused factories.
C) They are a special type of process-oriented layout.
D) Balancing their assembly line is more technological than worker oriented.
E) They are usually not machine-paced.

F) None of the above
G) A) and B)

Correct Answer

verifed

verified

To develop a good facility layout,what must be determined?