When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.

A) True
B) False

Correct Answer

verifed

verified

Routine maintenance activities require all of the following controls except


A) documentation updates
B) testing
C) formal authorization
D) internal audit approval

E) B) and D)
F) None of the above

Correct Answer

verifed

verified

In the conceptual design phase of the Systems Development Life Cycle (SDLC),task force members are focused on selecting the new system design.

A) True
B) False

Correct Answer

verifed

verified

An example of an intangible benefit is


A) expansion into other markets
B) reduction in supplies and overhead
C) more efficient operations
D) reduced equipment maintenance

E) B) and C)
F) C) and D)

Correct Answer

verifed

verified

Define the feasibility measures that should be considered during project analysis and give an example of each.

Correct Answer

verifed

verified

Technical feasibility is an assessment a...

View Answer

Mixing technologies from many vendors improves technical feasibility.

A) True
B) False

Correct Answer

verifed

verified

Which statement is not correct? The structured design approach


A) is a top-down approach
B) is documented by data flow diagrams and structure diagrams
C) assembles reusable modules rather than creating systems from scratch
D) starts with an abstract description of the system and redefines it to produce a more detailed description of the system

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

An example of a tangible benefit is


A) increased customer satisfaction
B) more current information
C) reduced inventories
D) faster response to competitor actions

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Contrast the source program library (SPL)management system to the database management system (DBMS).

Correct Answer

verifed

verified

The SPL software man...

View Answer

A commercial software system that is completely finished,tested,and ready for implementation is calledΒ a


A) backbone system
B) vendor-supported system
C) benchmark system
D) turnkey system

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Which of the following is not an advantage of commercial software? Commercial software


A) can be installed faster than a custom system
B) can be easily modified to the user's exact specifications
C) is significantly less expensive than a system developed in-house
D) is less likely to have errors than an equivalent system developed in-house

E) A) and D)
F) A) and B)

Correct Answer

verifed

verified

During the detailed feasibility study of the project,the systems professional who proposed the project should be involved in performing the study.

A) True
B) False

Correct Answer

verifed

verified

The role of the steering committee includes


A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Describe a risk associated with the phased cutover procedure for data conversion.

Correct Answer

verifed

verified

Incompatibilities ma...

View Answer

After the systems analysis phase of the System Development Life Cycle (SDLC) is complete,the company will have a formal systems analysis report on


A) the conceptual design of the new system
B) an evaluation of the new system
C) users' needs and requirements for the new system
D) a comparison of alternative implementation procedures for the new system

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except


A) the accountant is responsible for designing the physical system
B) the accountant is responsible to ensure that audit trails are preserved
C) the internal auditor is responsible to confirm that embedded audit modules are included in the conceptual design
D) the accountant is responsible to make sure that the accounting conventions that apply to the module are considered by the system designers

E) C) and D)
F) A) and B)

Correct Answer

verifed

verified

All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.

A) True
B) False

Correct Answer

verifed

verified

A cost-benefit analysis is a part of the detailed


A) operational feasibility study
B) schedule feasibility study
C) legal feasibility study
D) economic feasibility study

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

____________________ benefits can be measured and expressed in financial terms,while ____________________ benefits cannot be easily measured and/or quantified.

Correct Answer

verifed

verified

Intangible benefits are not physical,but can be measured and expressed in financial terms.

A) True
B) False

Correct Answer

verifed

verified