A) Technology failure
B) Incident record
C) Incident management
D) Technology recovery strategy
Correct Answer
verified
Multiple Choice
A) Hot site
B) Cold site
C) Warm site
D) Disaster site
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) The physical devices associated with a computer system.
B) The set of instructions the hardware executes to carry out specific tasks.
C) A computer designed to request information from a server.
D) A computer dedicated to providing information in response to requests.
Correct Answer
verified
Multiple Choice
A) High availability is when the system is not operating and can't be used, where unavailable is when a system is continuously operating at all times.
B) Unavailable only refers to clients, where high availability refers to servers.
C) Unavailable is when the system is not operating and can't be used, where high availability is when a system is continuously operating at all times.
D) High availability only refers to clients, where unavailable refers to servers.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Emergency
B) Emergency preparedness
C) Business Impact analysis
D) Technology failure
Correct Answer
verified
Multiple Choice
A) Flexibility
B) Scalability
C) Reliability
D) Affordability
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) MIS infrastructure manager
B) MIS specialist
C) Enterprise architect
D) Enterprise manager
Correct Answer
verified
Multiple Choice
A) Hardware
B) Software
C) Client
D) Server
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Emergency
B) Emergency preparedness
C) Business Impact analysis
D) Technology failure
Correct Answer
verified
Multiple Choice
A) A separate and fully equipped facility where the company can move immediately after a disaster and resume business.
B) A separate facility that does not have any computer equipment but is a place where employees can move after a disaster.
C) A separate facility with computer equipment that requires installation and configuration.
D) A detailed process for recovering information or a system in the event of a catastrophic disaster.
Correct Answer
verified
Multiple Choice
A) How frequently the system backup is performed.
B) Which systems and business processes are critical and the maximum amount of time the company can continue to operate without functioning systems.
C) How quickly the system recovery needs to be performed.
D) Where a hot site is located.
Correct Answer
verified
Multiple Choice
A) Accessibility, availability, maintainability, portability, reliability, scalability, and usability.
B) Backup and recovery planning, disaster recovery planning, and business continuity planning.
C) Grid computing, cloud computing, and virtualization.
D) Storage, network, and server virtualization.
Correct Answer
verified
Multiple Choice
A) A separate and fully equipped facility where the company can move immediately after a disaster and resume business.
B) A separate facility that does not have any computer equipment but is a place where employees can move after a disaster.
C) A separate facility with computer equipment that requires installation and configuration.
D) A detailed process for recovering information or a system in the event of a catastrophic disaster.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Showing 141 - 160 of 184
Related Exams